Berri Cogeneration Plant is a 300MW gas fired power project. It is located in Eastern Province, Saudi Arabia. The project is currently active. It has been developed in single phase.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 300 | 300 | – | Active | Eastern Province, Saudi Arabia |
---|
Description
The project is currently owned by Saudi Arabian Oil with a stake of 100%.
It is a Gas Turbine with Cogen power plant.
Contractors Involved
JGC Holdings was selected to render EPC services for the gas fired power project.
Mitsubishi Power was selected as the turbine supplier for the Gas fired project. The company provided 2 units of M501F gas turbines, each with 150MW nameplate capacity.
Mitsubishi Power supplied electric generator for the project.
Mitsubishi Power is the O&M contractor for thermal power project.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.