Biga Coal Fired Power Plant is a 405MW coal fired power project. It is located in Canakkale, Turkey. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in 2005.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Thermal 405 405 Active Canakkale, Turkey

Description

The project is currently owned by Icdas Elektrik Enerjisi Uretim Ve Yatirim.

It is a Steam Turbine power plant. The power plant run on dual-fuel. The primary fuel being used to power the plant is coal. In case of shortage of coal the plant can also run on Natural Gas.

Development Status

The project got commissioned in 2005.

Contractors Involved

Limac was selected to render EPC services for the coal fired power project.

Shanghai Turbine was selected as the turbine supplier for the Coal fired project.

Dongfang Boiler Group supplied steam boiler for the project.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.