Bihai is a 61.2MW hydro power project. It is located on Hoping river/basin in Hualien County, Taiwan. The project is currently active. It has been developed in single phase. The project construction commenced in 1995 and subsequently entered into commercial operation in 2011.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Hydropower 61.2 61.2 Active Hualien County, Taiwan

Description

The project is currently owned by Taiwan Power.

Bihai is a reservoir based project. The hydro reservoir capacity is 0.64 million cubic meter. The net head of the project is 416.8m. The project generated 237 GWh of electricity. The project cost is $569m.

Development Status

The project construction commenced in 1995 and subsequently entered into commercial operation in 2011.

Contractors Involved

Bharat Heavy Electricals was selected as the turbine supplier for the hydro power project. The company provided 1 unit of pelton turbine with 62.5MW nameplate capacity.

Bharat Heavy Electricals supplied 1 electric generator for the project. The generator capacity is 68 MVA.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.