Bolu-Goynuk Thermal Power Plant is a 270MW coal fired power project. It is located in Bolu, Turkey. The project is currently active. It has been developed in multiple phases. The project construction commenced in 2012 and subsequently entered into commercial operation in July 2015.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Thermal 270 270 Active Bolu, Turkey Aksa Goynuk Enerji Uretim

Description

The project is developed and owned by Aksa Goynuk Enerji Uretim.

It is a Steam Turbine power plant. The fuel is procured from Bolu-Goynuk lignite field.

The project generated 2,000,000MWh of electricity. The project cost is $390m.

Development Status

The project construction commenced in 2012 and subsequently entered into commercial operation in July 2015.

Contractors Involved

Doosan Skoda Power was selected as the turbine supplier for the Coal fired project. The company provided 2 steam turbines, each with 135MW nameplate capacity.

Doosan Skoda Power supplied electric generator for the project.

SES Tlmace supplied steam boiler for the project.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.