Bosen Combined Cycle Power Plant is a 263MW gas fired power project. It is located in Bursa, Turkey. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in 2000.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 263 | 263 | – | Active | Bursa, Turkey |
---|
Description
The project is currently owned by BOSEN Enerji Elektrik Uretimi.
It is a Combined Cycle Gas Turbine (CCGT) power plant.
Development Status
The project got commissioned in 2000.
Contractors Involved
ENPRODE Engineering & Consulting was selected to render EPC services for the Bosen Combined Cycle Power Plant (Bosen Combined Cycle Power Plant Block III).
Bosen Combined Cycle Power Plant (Bosen Combined Cycle Power Plant Block I) is equipped with Mitsubishi Power steam turbine. The phase consists of 1 steam turbine with 20MW nameplate capacity.
Bosen Combined Cycle Power Plant (Bosen Combined Cycle Power Plant Block I) is equipped with Siemens CW251B11 gas turbine. The phase consists of 1 gas turbine with 55MW nameplate capacity.
Bosen Combined Cycle Power Plant (Bosen Combined Cycle Power Plant Block II) is equipped with GE Power LM6000-PC™Sprint®* – 50Hz gas turbine. The phase consists of 1 gas turbine with 50MW nameplate capacity.
Bosen Combined Cycle Power Plant (Bosen Combined Cycle Power Plant Block II) is equipped with Siemens SST-300 steam turbine. The phase consists of 1 steam turbine with 14MW nameplate capacity.
Bosen Combined Cycle Power Plant (Bosen Combined Cycle Power Plant Block III) is equipped with GE Power LM6000-PD™Sprint® – 60Hz gas turbines. The phase consists of 2 gas turbines.
Bosen Combined Cycle Power Plant (Bosen Combined Cycle Power Plant Block III) is equipped with Siemens SST-400 steam turbine. The phase consists of 1 steam turbine.
Siemens Energy supplied electric generator for the Bosen Combined Cycle Power Plant (Bosen Combined Cycle Power Plant Block I).
John Cockerill Group supplied steam boiler for the Bosen Combined Cycle Power Plant (Bosen Combined Cycle Power Plant Block I).
Aalborg Engineering supplied steam boiler for the Bosen Combined Cycle Power Plant (Bosen Combined Cycle Power Plant Block II).
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.