Brista 2 Waste Fired Plant is a 20MW biopower project. It is located in Sodermanland, Sweden. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in November 2013.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Biopower | 20 | 20 | – | Active | Sodermanland, Sweden |
---|
Description
Fortum and Sollentuna Energi are currently owning the project having ownership stake of 85% and 15% respectively.
The project generates 140GWh electricity and supplies enough clean energy to power 40,000 households. The project cost is $289.112m.
The process of combustion has been adopted in this combined heat and power (CHP) project to release the stored energy from the feed. Industrial waste and municipal solid waste are used as a feedstock to power the project.
Development Status
The project got commissioned in November 2013.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.