Ceyhan is a 63.6MW hydro power project. It is located on ceyhan river/basin in Osmaniye, Turkey. The project is currently active. It has been developed in multiple phases. The project construction commenced in 2007 and subsequently entered into commercial operation in 2010.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 63.6 | 63.6 | – | Active | Osmaniye, Turkey | Nurol Holding |
---|
Description
The project was developed by Nurol Holding. The project is co-owned by Nurol Holding and Ozaltin Holding, with their respective ownership stake of 50% each.
Ceyhan is a reservoir based project. The project generated 251 GWh of electricity.
Development Status
The project construction commenced in 2007 and subsequently entered into commercial operation in 2010.
Contractors Involved
Ceyhan (Ceyhan Berkman) is equipped with GE Renewable Energy kaplan turbines. The phase consists of 3 turbines.
Ceyhan (Ceyhan Oskan) is equipped with GE Renewable Energy kaplan turbines. The phase consists of 3 turbines.
GE Renewable Energy was selected as the generator supplier for the hydro power project. The project consists of 6 generators.
About Nurol Holding
Nurol Holding Inc (Nurol) is a diversified holding company. Nurol has business interests in construction contracting, machinery manufacturing, defense, energy, technology, finance, real estate, and tourism. The company executes several infrastructure and transportation projects including bridges, dams, tunnels, industrial facilities, luxury housing units, hotels, shopping malls, and satellite towns. Nurol manufactures and distributes defense equipment and vehicles including armored combat vehicles and weapon systems in cooperation with BAE Systems. The company also develops innovative technologies for several industries such as defense, aviation, energy, pharmaceutical, metallurgy, chemicals, and textiles. It operates across Algeria, the UAE, Saudi Arabia, Morocco, Libya, Romania, Qatar, Georgia, Russia, Hungary, Turkmenistan, Uzbekistan, Kazakhstan, Afghanistan and Iraq. Nurol is headquartered in Ankara, Turkey.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.