Chiba Offshore Wind Project is a 600MW offshore wind power project. It is planned in Pacific Ocean, Chiba, Japan. The project is currently in permitting stage. It will be developed in single phase. The project construction is likely to commence in 2024 and is expected to enter into commercial operation in 2027.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Offshore | 600 | – | 600 | Permitting | Chiba, Japan | Chiba Offshore Wind |
---|
Description
The project is being developed by Chiba Offshore Wind. Northland Power, Shizen Energy and Tokyo Gas are currently owning the project.
The project cost is expected to be around $3,947.4m.
Development Status
The project construction is expected to commence from 2024. Subsequent to that it will enter into commercial operation by 2027.
About Chiba Offshore Wind
Chiba Offshore Wind Inc (Chiba Offshore Wind) is a Developer of early-stage offshore wind projects off the Pacific Ocean coastline of Chiba Prefecture. Chiba Offshore Wind is headquartered in Chiba, Japan.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.