Chiba Thermal Power Station is a 4,380MW gas fired power project. It is located in Chiba, Japan. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in December 1998.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 4,380 | 4,380 | – | Active | Chiba, Japan |
---|
Description
The project is currently owned by JERA with a stake of 100%.
It is a combined cycle gas turbine (ccgt) power plant.
Chiba Thermal Power Station (Chiba Thermal Power Station Group III Block I) consists of 1 gas turbine with 334MW nameplate capacity.
Chiba Thermal Power Station (Chiba Thermal Power Station Group III Block I) consists of 1 steam turbine with 166MW nameplate capacity.
Chiba Thermal Power Station (Chiba Thermal Power Station Group III Block II) consists of 1 gas turbine with 334MW nameplate capacity.
Chiba Thermal Power Station (Chiba Thermal Power Station Group III Block II) consists of 1 steam turbine with 166MW nameplate capacity.
Chiba Thermal Power Station (Chiba Thermal Power Station Group III Block III) consists of 1 gas turbine with 334MW nameplate capacity.
Chiba Thermal Power Station (Chiba Thermal Power Station Group III Block III) consists of 1 steam turbine with 166MW nameplate capacity.
Development Status
The project got commissioned in December 1998.
Contractors Involved
Chiba Thermal Power Station (Chiba Thermal Power Station Group I Block I) is equipped with GE Power steam turbine. The phase consists of 1 steam turbine with 118.1MW nameplate capacity.
Chiba Thermal Power Station (Chiba Thermal Power Station Group I Block I) is equipped with GE Power M701F gas turbine. The phase consists of 1 gas turbine with 241.9MW nameplate capacity.
Chiba Thermal Power Station (Chiba Thermal Power Station Group I Block II) is equipped with GE Power steam turbine. The phase consists of 1 steam turbine with 118.1MW nameplate capacity.
Chiba Thermal Power Station (Chiba Thermal Power Station Group I Block II) is equipped with GE Power M701F gas turbine. The phase consists of 1 gas turbine with 241.9MW nameplate capacity.
Chiba Thermal Power Station (Chiba Thermal Power Station Group I Block III) is equipped with GE Power steam turbine. The phase consists of 1 steam turbine with 118.1MW nameplate capacity.
Chiba Thermal Power Station (Chiba Thermal Power Station Group I Block III) is equipped with GE Power M701F gas turbine. The phase consists of 1 gas turbine with 241.9MW nameplate capacity.
Chiba Thermal Power Station (Chiba Thermal Power Station Group I Block IV) is equipped with GE Power steam turbine. The phase consists of 1 steam turbine with 118.1MW nameplate capacity.
Chiba Thermal Power Station (Chiba Thermal Power Station Group I Block IV) is equipped with GE Power M701F gas turbine. The phase consists of 1 gas turbine with 241.9MW nameplate capacity.
Chiba Thermal Power Station (Chiba Thermal Power Station Group II Block I) is equipped with GE Power steam turbine. The phase consists of 1 steam turbine with 127MW nameplate capacity.
Chiba Thermal Power Station (Chiba Thermal Power Station Group II Block I) is equipped with GE Power MS9001FA-50 Hz gas turbine. The phase consists of 1 gas turbine with 233MW nameplate capacity.
Chiba Thermal Power Station (Chiba Thermal Power Station Group II Block II) is equipped with GE Power steam turbine. The phase consists of 1 steam turbine with 127MW nameplate capacity.
Chiba Thermal Power Station (Chiba Thermal Power Station Group II Block II) is equipped with GE Power MS9001FA-50 Hz gas turbine. The phase consists of 1 gas turbine with 233MW nameplate capacity.
Chiba Thermal Power Station (Chiba Thermal Power Station Group II Block III) is equipped with GE Power steam turbine. The phase consists of 1 steam turbine with 127MW nameplate capacity.
Chiba Thermal Power Station (Chiba Thermal Power Station Group II Block III) is equipped with GE Power MS9001FA-50 Hz gas turbine. The phase consists of 1 gas turbine with 233MW nameplate capacity.
Chiba Thermal Power Station (Chiba Thermal Power Station Group II Block IV) is equipped with GE Power steam turbine. The phase consists of 1 steam turbine with 127MW nameplate capacity.
Chiba Thermal Power Station (Chiba Thermal Power Station Group II Block IV) is equipped with GE Power MS9001FA-50 Hz gas turbine. The phase consists of 1 gas turbine with 233MW nameplate capacity.
GE Power supplied electric generator for the Chiba Thermal Power Station (Chiba Thermal Power Station Group I Block I).
GE Power supplied electric generator for the Chiba Thermal Power Station (Chiba Thermal Power Station Group I Block II).
GE Power supplied electric generator for the Chiba Thermal Power Station (Chiba Thermal Power Station Group I Block III).
GE Power supplied electric generator for the Chiba Thermal Power Station (Chiba Thermal Power Station Group I Block IV).
GE Power supplied electric generator for the Chiba Thermal Power Station (Chiba Thermal Power Station Group II Block I).
GE Power supplied electric generator for the Chiba Thermal Power Station (Chiba Thermal Power Station Group II Block II).
GE Power supplied electric generator for the Chiba Thermal Power Station (Chiba Thermal Power Station Group II Block III).
GE Power supplied electric generator for the Chiba Thermal Power Station (Chiba Thermal Power Station Group II Block IV).
GE Power supplied steam boiler for the Chiba Thermal Power Station (Chiba Thermal Power Station Group I Block I).
GE Power supplied steam boiler for the Chiba Thermal Power Station (Chiba Thermal Power Station Group I Block II).
GE Power is the O&M contractor for the Chiba Thermal Power Station (Chiba Thermal Power Station Group I Block I) for a period of 15 years.
GE Power is the O&M contractor for the Chiba Thermal Power Station (Chiba Thermal Power Station Group I Block II) for a period of 15 years.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.