Chiriqui-Los Valles is a 54.8MW hydro power project. It is located on Los Valles river/basin in Chiriqui, Panama. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in 1979.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 54.8 | 54.8 | – | Active | Chiriqui, Panama |
---|
Description
The project is currently owned by The AES with a stake of 49.07%.
Chiriqui-Los Valles is a run-of-river project. Chiriqui-Los Valles underwent through rehabilitation & modernization during 2006-2007.
The hydro power project consists of 2 turbines, each with 27.4MW nameplate capacity.
Development Status
The project got commissioned in 1979.
Contractors Involved
GE Renewable Energy supplied 2 electric generators for the project. The generator capacity is 27 MVA.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.