Cimego is a 229.2MW hydro power project. It is located on Chiese river/basin in Trentino-Alto Adige, Italy. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in 1956.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 229.2 | 229.2 | – | Active | Trentino-Alto Adige, Italy |
---|
Description
The project is currently owned by Hydro Dolomiti Enel.
The project generated 439.9 GWh of electricity.
Development Status
The project got commissioned in 1956.

US Tariffs are shifting - will you react or anticipate?
Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.
By GlobalDataContractors Involved
Cimego (Cimego I) is equipped with Ansaldo Energia pelton turbines. The phase consists of 2 turbines.
Cimego (Cimego II) is equipped with Ansaldo Energia francis turbine. The phase consists of 1 turbine.
Ercole Marelli Power supplied 1 electric generator for the Cimego (Cimego I). The generator capacity is 110 MVA.
Ercole Marelli Power supplied 1 electric generator for the Cimego (Cimego II). The generator capacity is 110 MVA.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.