Cincinato Solar PV Park is a 49.966MW solar PV power project. It is located in Extremadura, Spain. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in 2022.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Solar PV | 49.966 | 49.966 | – | Active | Extremadura, Spain | Enel Green Power Espana SLU; Seguidores Solares Planta 2 |
---|
Description
The project was developed by Enel Green Power Espana SLU and Seguidores Solares Planta 2. The project is currently owned by Enel Green Power Espana SLU with a stake of 100%.
Cincinato Solar PV Park is a ground-mounted solar project which is spread over an area of 150.712 hectares.
The project cost is $35.975m.
The project consists of 131,490 modules, each with 380W nameplate capacity.
Development Status
The project got commissioned in 2022.
Contractors Involved
Elecnor was selected to render EPC services for the solar PV power project.
About Seguidores Solares Planta 2
Seguidores Solares Planta 2 SL (Seguidores Solares Planta 2) generates, transmits and distributes electricity through renewable sources. Seguidores Solares Planta 2 is headquartered in Spain.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.