Corriedale Wind Project is a 52.5MW onshore wind power project. It is located in Wyoming, the US. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in December 2020.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Onshore | 52.5 | 52.5 | – | Active | Wyoming, the US | Black Hills Energy |
---|
Description
The project is developed and owned by Black Hills Energy. The company has a stake of 50%.
The electricitiy generated from the plant has offsetted 50,000t of carbon dioxide emissions (CO2) a year. The project cost is $79m.
Development Status
The project is currently active. The project got commissioned in December 2020.
Contractors Involved
John Wood Group was selected to render EPC services for the wind power project.
GE Renewable Energy was selected as the turbine supplier for the wind power project. The company provided 21 turbines, each with 2.5MW nameplate capacity.
About Black Hills Energy
Black Hills Energy Ventures, Inc. is the independent energy business, engaged in power generation and the production of coal, oil and natural gas, and fuel marketing.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.