CSF Continua Chachani Solar PV Park is a 100MW solar PV power project. It is planned in Arequipa, Peru. The project is currently in permitting stage. It will be developed in single phase. The project construction is likely to commence in 2023 and is expected to enter into commercial operation in 2024.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Solar PV | 100 | – | 100 | Permitting | Arequipa, Peru | Continua Energias Positivas |
---|
Description
The project is being developed and currently owned by Continua Energias Positivas.
CSF Continua Chachani Solar PV Park is a ground-mounted solar project which is planned over 282 hectares.
The project cost is expected to be around $188.204m.
100 inverters are likely to get installed at the project site.
Development Status
The project construction is expected to commence from 2023. Subsequent to that it will enter into commercial operation by 2024.
Contractors Involved
JinkoSolar Holding will be the supplier of the PV modules for the solar power project. The company is expected to provide 460,800 modules each with 260W of nameplate capacity.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.