Dambo is an 800MW hydro power project. It is planned in Calabarzon, Philippines. The project is currently in permitting stage. It will be developed in single phase. The project construction is likely to commence in 2025 and is expected to enter into commercial operation in 2029.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 800 | – | 800 | Permitting | Calabarzon, Philippines | Belisama Hydropower |
---|
Description
The project is being developed and currently owned by Belisama Hydropower.
Dambo is a pumped storage project. The hydro reservoir capacity is planned to be 7.2 million cubic meter. The net head of the project will be 450m. The project cost is expected to be around $960.364m.
Development Status
The project construction is expected to commence from 2025. Subsequent to that it will enter into commercial operation by 2029.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.