DGEN Combined Cycle Power Plant is a 1,200MW gas fired power project. It is located in Gujarat, India. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in January 2014.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 1,200 | 1,200 | – | Active | Gujarat, India | Torrent Energy |
---|
Description
The project is developed and owned by Torrent Energy. The company has a stake of 100%.
It is a combined cycle gas turbine (ccgt) power plant. The fuel is procured from Gujarat State Petronet Limited.
Development Status
The project got commissioned in January 2014.

US Tariffs are shifting - will you react or anticipate?
Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.
By GlobalDataContractors Involved
Siemens and Siemens (Proprietary) were selected to render EPC services for the gas fired power project.
DGEN Combined Cycle Power Plant (DGEN Combined Cycle Power Plant Block I) is equipped with Siemens SGT5-4000F gas turbine. The phase consists of 1 gas turbine.
DGEN Combined Cycle Power Plant (DGEN Combined Cycle Power Plant Block I) is equipped with Siemens SST5-5000 steam turbine. The phase consists of 1 steam turbine.
DGEN Combined Cycle Power Plant (DGEN Combined Cycle Power Plant Block II) is equipped with Siemens SGT5-4000F gas turbine. The phase consists of 1 gas turbine.
DGEN Combined Cycle Power Plant (DGEN Combined Cycle Power Plant Block II) is equipped with Siemens SST5-5000 steam turbine. The phase consists of 1 steam turbine.
DGEN Combined Cycle Power Plant (DGEN Combined Cycle Power Plant Block III) is equipped with Siemens SGT5-4000F gas turbine. The phase consists of 1 gas turbine.
DGEN Combined Cycle Power Plant (DGEN Combined Cycle Power Plant Block III) is equipped with Siemens SST5-5000 steam turbine. The phase consists of 1 steam turbine.
Siemens supplied Hydrogen-Cooled electric generator for the DGEN Combined Cycle Power Plant (DGEN Combined Cycle Power Plant Block I).
Siemens supplied Hydrogen-Cooled electric generator for the DGEN Combined Cycle Power Plant (DGEN Combined Cycle Power Plant Block II).
Siemens supplied Hydrogen-Cooled electric generator for the DGEN Combined Cycle Power Plant (DGEN Combined Cycle Power Plant Block III).
Doosan Heavy Industries & Construction supplied steam boiler for the DGEN Combined Cycle Power Plant (DGEN Combined Cycle Power Plant Block I).
Doosan Heavy Industries & Construction supplied steam boiler for the DGEN Combined Cycle Power Plant (DGEN Combined Cycle Power Plant Block II).
Doosan Heavy Industries & Construction supplied steam boiler for the DGEN Combined Cycle Power Plant (DGEN Combined Cycle Power Plant Block III).
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.