Donghae IPP Power Plant is a 1,190MW coal fired power project. It is located in Gangwon, South Korea. The project is currently active. It has been developed in multiple phases. The project construction commenced in 2013 and subsequently entered into commercial operation in March 2017.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 1,190 | 1,190 | – | Active | Gangwon, South Korea | GS Donghae Electric Power |
---|
Description
The project was developed by GS Donghae Electric Power. GS E&R, Korea East-West Power and ST International are currently owning the project having ownership stake of 51%, 34% and 15% respectively.
It is a steam turbine power plant that is used for Baseload.
Development Status
The project construction commenced in 2013 and subsequently entered into commercial operation in March 2017.

US Tariffs are shifting - will you react or anticipate?
Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.
By GlobalDataContractors Involved
DL, STX Construction and STX Heavy Industries were selected to render EPC services for the coal fired power project.
Donghae IPP Power Plant (Donghae IPP Power Plant Unit I) is equipped with Mitsubishi Power steam turbine. The phase consists of 1 steam turbine with 595MW nameplate capacity.
Donghae IPP Power Plant (Donghae IPP Power Plant Unit II) is equipped with Mitsubishi Power steam turbine. The phase consists of 1 steam turbine with 595MW nameplate capacity.
BHI supplied steam boiler for the Donghae IPP Power Plant (Donghae IPP Power Plant Unit I).
BHI supplied steam boiler for the Donghae IPP Power Plant (Donghae IPP Power Plant Unit II).
GS O&M and Seokwon Industry CP.,Ltd were contracted to render operations & maintenance services for the project.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.