Eisenhuttenstadt Biomass Power Plant is a 32MW biopower project. It is located in Brandenburg, Germany. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in 2011.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Biopower | 32 | 32 | – | Active | Brandenburg, Germany |
---|
Description
The project cost is $154.32m.
Eisenhuttenstadt Biomass Power Plant is a combined heat and power (CHP) project.
Development Status
The project got commissioned in 2011.
Contractors Involved
Andritz Energy & Environment supplied steam boiler for the project. The boiler installed at the site has a capacity of 176TPH. The temperature witnessed inside the boiler is around 470°C. The steam is pressurized inside the boiler at 69bar.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.