Elecgas (Pego) Combined Cycle Power Plant is an 836MW gas fired power project. It is located in Santarem, Portugal. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in December 2010.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Thermal 836 836 Active Santarem, Portugal

Description

Endesa Generacion, Engie and Marubeni are currently owning the project having ownership stake of 50%, 25% and 25% respectively.

It is a Combined Cycle Gas Turbine (CCGT) power plant.

The project cost is $775.63m.

Development Status

GlobalData Strategic Intelligence

US Tariffs are shifting - will you react or anticipate?

Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.

By GlobalData

The project got commissioned in December 2010.

Power Purchase Agreement

The power generated from the project is sold to Endesa Generacion under a power purchase agreement for a period of 25 years.

Contractors Involved

Siemens was selected to render EPC services for the gas fired power project.

Elecgas (Pego) Combined Cycle Power Plant (Elecgas (Pego) Combined Cycle Power Plant Block I) is equipped with Siemens SGT5-4000F, V94.3A gas turbine. The phase consists of 1 gas turbine.

Elecgas (Pego) Combined Cycle Power Plant (Elecgas (Pego) Combined Cycle Power Plant Block I) is equipped with Siemens Single Flow, 2-Case, H&E-Type steam turbine. The phase consists of 1 steam turbine.

Elecgas (Pego) Combined Cycle Power Plant (Elecgas (Pego) Combined Cycle Power Plant Block II) is equipped with Siemens SGT5-4000F, V94.3A gas turbine. The phase consists of 1 gas turbine.

Elecgas (Pego) Combined Cycle Power Plant (Elecgas (Pego) Combined Cycle Power Plant Block II) is equipped with Siemens Single Flow, 2-Case, H&E-Type steam turbine. The phase consists of 1 steam turbine.

Siemens supplied 3-Phase, Radial, Hydrogen Cooled electric generator for the Elecgas (Pego) Combined Cycle Power Plant (Elecgas (Pego) Combined Cycle Power Plant Block I).

Siemens supplied 3-Phase, Radial, Hydrogen Cooled electric generator for the Elecgas (Pego) Combined Cycle Power Plant (Elecgas (Pego) Combined Cycle Power Plant Block II).

Siemens Heat Transfer Technology supplied steam boiler for the Elecgas (Pego) Combined Cycle Power Plant (Elecgas (Pego) Combined Cycle Power Plant Block I).

Siemens Heat Transfer Technology supplied steam boiler for the Elecgas (Pego) Combined Cycle Power Plant (Elecgas (Pego) Combined Cycle Power Plant Block II).

PEGOP – Energia Electrica is the O&M contractor for thermal power project.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.