Feitsui is a 70MW hydro power project. It is located on Bei Shi river/basin in New Taipei, Taiwan. The project is currently active. It has been developed in single phase. The project commenced construction in 1987.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 70 | 70 | – | Active | New Taipei, Taiwan |
---|
Description
The project is currently owned by Taiwan Power.
Feitsui is a run-of-river project. The hydro reservoir capacity is 335.5 million cubic meter. The net head of the project is 58.011m. The project generated 220 GWh of electricity.
Development Status
The project commenced construction in 1987.
Contractors Involved
Andritz Hydro was selected as the turbine supplier for the hydro power project. The company provided 1 unit of francis turbine with 72MW nameplate capacity.
Andritz Hydro supplied electric generator(s) for the project.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.