Fort Peck is an 185.3MW hydro power project. It is located on Missouri river/basin in Montana, the US. The project is currently active. It has been developed in single phase. The project construction commenced in 1941 and subsequently entered into commercial operation in 1943.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 185.3 | 185.3 | – | Active | Montana, the US | USCE-Missouri River District |
---|
Description
The project was developed by USCE-Missouri River District and is currently owned by US Army Corps of Engineers with a stake of 100%.
Fort Peck is a reservoir based project.
Development Status
The project construction commenced in 1941 and subsequently entered into commercial operation in 1943.

US Tariffs are shifting - will you react or anticipate?
Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.
By GlobalDataContractors Involved
The turbines for the hydro power project have been supplied by Allis-Chalmers Power Systems and Voith Hydro Holding.
The electric generators for the project were procured from Allis-Chalmers Power Systems and Elliott Energy Systems.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.