Futtsu Combined Cycle Power Plant is a 5,351MW gas fired power project. It is located in Chiba, Japan. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in November 1986. Buy the profile here.

Smarter leaders trust GlobalData

Report-cover

Premium Insights Futtsu Combined Cycle Power Plant

Buy the Profile

Premium Insights

The gold standard of business intelligence.

Find out more

Description

The project is currently owned by JERA with a stake of 100%.

It is a Combined Cycle Gas Turbine (CCGT) power plant.

Futtsu Combined Cycle Power Plant (Futtsu Combined Cycle Power Plant Group I) consists of 7 gas turbines.

Futtsu Combined Cycle Power Plant (Futtsu Combined Cycle Power Plant Group I) consists of 7 steam turbines.

Futtsu Combined Cycle Power Plant (Futtsu Combined Cycle Power Plant Group III) consists of 4 steam turbines with 131MW nameplate capacity.

Development status

The project got commissioned in November 1986.

Contractors involved

Toshiba Energy Systems and Solutions was selected to render engineering procurement construction services for the gas fired power project.

Futtsu Combined Cycle Power Plant (Futtsu Combined Cycle Power Plant Group II) is equipped with GE Power steam turbines. The Gas fired phase consists 7 steam turbines.

Futtsu Combined Cycle Power Plant (Futtsu Combined Cycle Power Plant Group II) is equipped with Mitsubishi Power H-100(110)* - 50Hz gas turbines. The phase consists of 7 gas turbines.

Futtsu Combined Cycle Power Plant (Futtsu Combined Cycle Power Plant Group III) is equipped with GE Power MS9001FA++ gas turbines. The phase consists of 4 gas turbines with 249MW nameplate capacity.

Futtsu Combined Cycle Power Plant (Futtsu Combined Cycle Power Plant Group IV) is equipped with GE Power 1x1 SS 9HA.01 gas turbines. The phase consists of 3 gas turbines with 336MW nameplate capacity.

Futtsu Combined Cycle Power Plant (Futtsu Combined Cycle Power Plant Group IV) is equipped with Toshiba Energy Systems and Solutions Tandem Compound 2 Casing Double-flow, Reheat Condensing Type steam turbines. The phase consists of 3 steam turbines with 171MW nameplate capacity.

GE Power supplied electric generator for the Futtsu Combined Cycle Power Plant (Futtsu Combined Cycle Power Plant Group IV).

Toshiba Energy Systems and Solutions supplied Three-Phase AC Water Cooled Synchronous electric generator for the Futtsu Combined Cycle Power Plant (Futtsu Combined Cycle Power Plant Group IV).

GE Power supplied steam boiler for the Futtsu Combined Cycle Power Plant (Futtsu Combined Cycle Power Plant Group I).

GE Power supplied steam boiler for the Futtsu Combined Cycle Power Plant (Futtsu Combined Cycle Power Plant Group II).

IHI supplied steam boiler for the Futtsu Combined Cycle Power Plant (Futtsu Combined Cycle Power Plant Group III).

IHI supplied steam boiler for the Futtsu Combined Cycle Power Plant (Futtsu Combined Cycle Power Plant Group IV).

For more details on Futtsu Combined Cycle Power Plant, buy the profile here.

Premium Insights

From

The gold standard of business intelligence.

Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.

GlobalData

GlobalData, the leading provider of industry intelligence, provided the underlying research used to produce this article.

This information is drawn from GlobalData’s Power Intelligence Center, which provides detailed profiles of over 170,000 active, planned and under construction power plants worldwide from announcement through to operation across all technologies and countries worldwide.