Gansu Jingtai Hongshan Wind Power Phase I is a 49.5MW onshore wind power project. It is located in Gansu, China. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in November 2013.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Onshore | 49.5 | 49.5 | – | Active | Gansu, China | CPI Huanghe Hydropower Development |
---|
Description
The project was developed by CPI Huanghe Hydropower Development and is currently owned by State Power Investment.
The project generates 94,580MWh electricity thereby offsetting 71,000t of carbon dioxide emissions (CO2) a year. The project cost is $57.78m.
The wind power project consists of 24 turbines each with 2 MW nameplate capacity and 1 turbines each with 1.5 MW nameplate capacity respectively.
Development Status
The project is currently active. The project got commissioned in November 2013.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.