GDF SUEZ Cartagena Combined Cycle Power Plant is a 1,193.7MW gas fired power project. It is located in Murcia, Spain. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in October 2006.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 1,193.7 | 1,193.7 | – | Active | Murcia, Spain |
---|
Description
The project is currently owned by Engie with a stake of 100%.
It is a combined cycle gas turbine (ccgt) power plant. The power plant run on dual-fuel. The primary fuel being used to power the plant is natural gas. In case of shortage of natural gas the plant can also run on Diesel. The fuel is procured from Enagas, S.A..
Development Status
The project got commissioned in October 2006.

US Tariffs are shifting - will you react or anticipate?
Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.
By GlobalDataContractors Involved
Initec Energia was selected to render EPC services for the gas fired power project.
GDF SUEZ Cartagena Combined Cycle Power Plant (GDF SUEZ Cartagena Combined Cycle Power Plant Block I) is equipped with Mitsubishi Power steam turbine. The phase consists of 1 steam turbine with 138.6MW nameplate capacity.
GDF SUEZ Cartagena Combined Cycle Power Plant (GDF SUEZ Cartagena Combined Cycle Power Plant Block I) is equipped with Mitsubishi Power M701F3 gas turbine. The phase consists of 1 gas turbine with 259.3MW nameplate capacity.
GDF SUEZ Cartagena Combined Cycle Power Plant (GDF SUEZ Cartagena Combined Cycle Power Plant Block II) is equipped with Mitsubishi Power steam turbine. The phase consists of 1 steam turbine with 138.6MW nameplate capacity.
GDF SUEZ Cartagena Combined Cycle Power Plant (GDF SUEZ Cartagena Combined Cycle Power Plant Block II) is equipped with Mitsubishi Power M701F3 gas turbine. The phase consists of 1 gas turbine with 259.3MW nameplate capacity.
GDF SUEZ Cartagena Combined Cycle Power Plant (GDF SUEZ Cartagena Combined Cycle Power Plant Block III) is equipped with Mitsubishi Power steam turbine. The phase consists of 1 steam turbine with 138.6MW nameplate capacity.
GDF SUEZ Cartagena Combined Cycle Power Plant (GDF SUEZ Cartagena Combined Cycle Power Plant Block III) is equipped with Mitsubishi Power M701F3 gas turbine. The phase consists of 1 gas turbine with 259.3MW nameplate capacity.
Mitsubishi Power supplied electric generator for the GDF SUEZ Cartagena Combined Cycle Power Plant (GDF SUEZ Cartagena Combined Cycle Power Plant Block I).
Mitsubishi Power supplied electric generator for the GDF SUEZ Cartagena Combined Cycle Power Plant (GDF SUEZ Cartagena Combined Cycle Power Plant Block II).
Mitsubishi Power supplied electric generator for the GDF SUEZ Cartagena Combined Cycle Power Plant (GDF SUEZ Cartagena Combined Cycle Power Plant Block III).
Mitsubishi Power supplied steam boiler for the GDF SUEZ Cartagena Combined Cycle Power Plant (GDF SUEZ Cartagena Combined Cycle Power Plant Block I).
Mitsubishi Power supplied steam boiler for the GDF SUEZ Cartagena Combined Cycle Power Plant (GDF SUEZ Cartagena Combined Cycle Power Plant Block II).
Mitsubishi Power supplied steam boiler for the GDF SUEZ Cartagena Combined Cycle Power Plant (GDF SUEZ Cartagena Combined Cycle Power Plant Block III).
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.