Gojak is a 55.5MW hydro power project. It is located on Dobra river/basin in Croatia. The project is currently active. It has been developed in single phase. The project construction commenced in 1954 and subsequently entered into commercial operation in 1959.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 55.5 | 55.5 | – | Active | Croatia |
---|
Description
The project is currently owned by HEP-Proizvodnja.
Gojak is a run-of-river project. The net head of the project is 118m. Gojak underwent through rehabilitation & modernization during 2006. The project generated 255 GWh of electricity.
The hydro power project consists of 3 turbines, each with 18.5MW nameplate capacity.
Development Status
The project construction commenced in 1954 and subsequently entered into commercial operation in 1959.
Contractors Involved
Koncar Generators and Motors supplied 3 electric generators for the project. The generator capacity is 20 MVA.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.