Graho Nyabu Geothermal Power Plant is an 110MW geothermal power project. It is planned in Jambi, Indonesia. The project is currently in permitting stage. It will be developed in single phase. Post completion of the construction, the project is expected to get commissioned in 2025.
Project TypeTotal Capacity (MW)Active Capacity (MW)Pipeline Capacity (MW)Project StatusProject LocationProject DeveloperGeothermal110-110PermittingJambi, IndonesiaPT EDC Indonesia
Description
The project is being developed and currently owned by PT EDC Indonesia.
Graho Nyabu Geothermal Power Plant will run at a temperature of 236 Degree Celsius.
The project cost is expected to be around $440m.

US Tariffs are shifting - will you react or anticipate?
Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.
By GlobalDataThe geothermal power project consists of 2 turbines, each with 55MW nameplate capacity.
Development Status
Post completion of the construction, the project is expected to get commissioned in 2025.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.