Greene County Gas Turbine Power Plant is a 720MW gas fired power project. It is located in Alabama, the US. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in May 1995.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 720 | 720 | – | Active | Alabama, the US |
---|
Description
The project is currently owned by Alabama Power with a stake of 100%.
It is a Gas Turbine power plant. The power plant run on dual-fuel. The primary fuel being used to power the plant is natural gas. In case of shortage of natural gas the plant can also run on Distillate Fuel Oil. The fuel is procured from Southern Natural Gas.
The project generated 94,547MWh of electricity.
Development Status

US Tariffs are shifting - will you react or anticipate?
Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.
By GlobalDataThe project got commissioned in May 1995.
Contractors Involved
GE Power was selected as the turbine supplier for thermal power project. The project consists of 9 units of 7E.03 turbines, each with 80MW nameplate capacity.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.