Greenough River Solar Farm is a 40MW solar PV power project. It is located in Western Australia, Australia. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in October 2012.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Solar PV | 40 | 40 | – | Active | Western Australia, Australia | Bright Energy Investments; Synergy |
---|
Description
The project was developed by Bright Energy Investments and Synergy. Bright Energy Investments, GE Energy Financial Services and Synergy are currently owning the project.
Greenough River Solar Farm is a ground-mounted solar project which is spread over an area of 244 hectares.
The project generates 103GWh electricity and supplies enough clean energy to power 16,300 households.
Development Status
The project got commissioned in October 2012.
Power Purchase Agreement
The power generated from the Greenough River Solar Farm (Greenough River Solar Farm Phase 1) is sold to Water under a power purchase agreement for a period of 15 years. The contracted capacity is 10MW.
Contractors Involved
First Solar was selected to render EPC services for the Greenough River Solar Farm (Greenough River Solar Farm Phase 1) project. juwi Renewable Energy was selected to render EPC services for the Greenough River Solar Farm (Greenough River Solar Farm Phase 2) project.
First Solar was selected as the supplier of the PV modules for the Greenough River Solar Farm (Greenough River Solar Farm Phase 1). The company provided 150,000 modules each with 85W of nameplate capacity.
First Solar was selected as the supplier of the PV modules for the Greenough River Solar Farm (Greenough River Solar Farm Phase 2). The company installed 300,000 modules at the site.
SMA Solar Technology supplied 16 of its CP XT 700 inverters to the Greenough River Solar Farm (Greenough River Solar Farm Phase 1) site.
The Greenough River Solar Farm (Greenough River Solar Farm Phase 2) is utilising single axis trackers supplied by NEXTracker.
First Solar is the O&M contractor for the Greenough River Solar Farm (Greenough River Solar Farm Phase 1) for a period of 15 years.
About Synergy
Synergy is a state owned not-for-profit integrated electricity generator and energy retailer. It produces electricity, and supplies electric power and gas on retail and wholesale basis. The company generates power using the coal, wind, solar and diesel sources. Synergy owns and operates electricity generating assets in the South West Interconnected System (SWIS). Under ring fenced arrangements, it also trades energy and related products. The company serves residential, business and industrial customers with in the SWIS and wholesale customers across the state. Synergy is headquartered in Perth, Western Australia, Australia
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.