Guangdong Taishan Xiachuandao Wind Farm Project is a 42.75MW onshore wind power project. It is located in Guangdong, China. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in March 2012.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Onshore 42.75 42.75 Active Guangdong, China CGN Wind Power

Description

The project was developed by CGN Wind Power and is currently owned by China General Nuclear Power.

The project generates 76,840MWh electricity thereby offsetting 68,641t of carbon dioxide emissions (CO2) a year. The project cost is $50.325m.

Development Status

The project is currently active. The project got commissioned in March 2012.

Contractors Involved

Xinjiang Goldwind Science & Technology was selected as the turbine supplier for the wind power project. The company provided 57 units of Goldwind S48/750 turbines, each with 0.75MW nameplate capacity.

About CGN Wind Power

CGN Wind Power Co., Ltd is engaged in the development, construction, operation and maintenance for wind power projects.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.