Gumati is a 66.8MW hydro power project. It is located on Rioni river/basin in Imereti, Georgia. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in 1956.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 66.8 | 66.8 | – | Active | Imereti, Georgia |
---|
Description
The project is currently owned by ENERGO-PRO with a stake of 100%.
Gumati is a reservoir based project. The hydro reservoir capacity is 13 million cubic meter. The project generated 376 GWh of electricity.
Development Status
The project got commissioned in 1956.
Contractors Involved
Gumati (Gumati Phase I) is equipped with Strojirny Brno kaplan turbine. The phase consists of 1 turbine with 13MW nameplate capacity.
Power Machines supplied 1 electric generator for the Gumati (Gumati Phase I). The generator capacity is 15 MVA.
Power Machines supplied 1 electric generator for the Gumati (Gumati Phase II). The generator capacity is 9.5 MVA.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.