H Neely Henry Dam is a 72.9MW hydro power project. It is located on Coosa river/basin in Alabama, the US. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in 1966.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 72.9 | 72.9 | – | Active | Alabama, the US |
---|
Description
The project is currently owned by Alabama Power with a stake of 100%.
The gross head of the project is 10.668m.
Development Status
The project got commissioned in 1966.
Power Purchase Agreement
The power generated from the project is sold to Alabama Power under a power purchase agreement.
Contractors Involved
Newport News Industrial was selected as the turbine supplier for the hydro power project. The company provided 3 units of propeller turbines, each with 24.3MW nameplate capacity.
GE Renewable Energy supplied 3 electric generators for the project. The generator capacity is 27 MVA.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.