Harbin No 3 Power Plant is a 1,600MW coal fired power project. It is located in Heilongjiang, China. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in 1987.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 1,600 | 1,600 | – | Active | Heilongjiang, China |
---|
Description
The project is currently owned by Heilongjiang Harbin No.3 Power Generation.
It is a steam turbine power plant.
Development Status
The project got commissioned in 1987.

US Tariffs are shifting - will you react or anticipate?
Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.
By GlobalDataContractors Involved
Harbin Power Engineering was selected to render EPC services for the coal fired power project.
Harbin No 3 Power Plant (Harbin No 3 Power Plant Phase I Unit I) is equipped with Harbin Turbine steam turbine. The phase consists of 1 steam turbine with 200MW nameplate capacity.
Harbin No 3 Power Plant (Harbin No 3 Power Plant Phase I Unit II) is equipped with Harbin Turbine steam turbine. The phase consists of 1 steam turbine with 200MW nameplate capacity.
Harbin No 3 Power Plant (Harbin No 3 Power Plant Phase II Unit I) is equipped with Harbin Turbine steam turbine. The phase consists of 1 steam turbine with 600MW nameplate capacity.
Harbin No 3 Power Plant (Harbin No 3 Power Plant Phase II Unit II) is equipped with Harbin Turbine steam turbine. The phase consists of 1 steam turbine with 600MW nameplate capacity.
Harbin Electric Machinery supplied QFSN 200-2 electric generator for the Harbin No 3 Power Plant (Harbin No 3 Power Plant Phase I Unit I).
Harbin Electric Machinery supplied QFSN 200-2 electric generator for the Harbin No 3 Power Plant (Harbin No 3 Power Plant Phase I Unit II).
Harbin Electric Machinery supplied QFSN 600-2YH electric generator for the Harbin No 3 Power Plant (Harbin No 3 Power Plant Phase II Unit I).
Harbin Electric Machinery supplied QFSN 600-2YH electric generator for the Harbin No 3 Power Plant (Harbin No 3 Power Plant Phase II Unit II).
Harbin Boiler supplied steam boiler for the Harbin No 3 Power Plant (Harbin No 3 Power Plant Phase I Unit I).
Harbin Boiler supplied steam boiler for the Harbin No 3 Power Plant (Harbin No 3 Power Plant Phase I Unit II).
Harbin Boiler supplied steam boiler for the Harbin No 3 Power Plant (Harbin No 3 Power Plant Phase II Unit I).
Harbin Boiler supplied steam boiler for the Harbin No 3 Power Plant (Harbin No 3 Power Plant Phase II Unit II).
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.