Hasdeo Bango is a 120MW hydro power project. It is located on Hasdeo river/basin in Chhattisgarh, India. The project is currently active. It has been developed in single phase. The project construction commenced in 1967 and subsequently entered into commercial operation in 1994.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Hydropower 120 120 Active Chhattisgarh, India

Description

The project is currently owned by Chhattisgarh State Power Distribution.

Hasdeo Bango is a reservoir based project. The gross head and net head of the project are 67.76m and 53m respectively. The project generated 305.33 GWh of electricity.

Development Status

The project construction commenced in 1967 and subsequently entered into commercial operation in 1994.

Contractors Involved

Bharat Heavy Electricals was selected as the turbine supplier for the hydro power project. The company provided 3 units of francis turbines, each with 40MW nameplate capacity.

Bharat Heavy Electricals supplied electric generator(s) for the project. The generator capacity is 63 MVA.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.