Hokkaido-Muroran Biomass Power Plant is a 74.9MW biopower project. It is located in Hokkaido, Japan. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in May 2020.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Biopower 74.9 74.9 Active Hokkaido, Japan Muroran Biomass Power Generation G.K

Description

The project was developed by Muroran Biomass Power Generation G.K. ENEOS and JGC Holdings are currently owning the project having ownership stake of 90% and 10% respectively.

The project cost is $312.776m.

Palm kernel shells which is a kind of agricultural by-product is used as a feedstock to power the project.

Development Status

GlobalData Strategic Intelligence

US Tariffs are shifting - will you react or anticipate?

Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.

By GlobalData

The project got commissioned in May 2020.

Contractors Involved

JGC Holdings was selected to render EPC services for the biopower project.

Sumitomo SHI FW Energia supplied steam boiler for the project.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.