Holtwood Expansion is a 125MW hydro power project. It is located on Susquehanna river/basin in Pennsylvania, the US. The project is currently active. It has been developed in single phase. The project construction commenced in 2010 and subsequently entered into commercial operation in 2013.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Hydropower 125 125 Active Pennsylvania, the US

Description

The project is currently owned by Brookfield Renewable Partners.

The project cost is $440m.

Development Status

The project construction commenced in 2010 and subsequently entered into commercial operation in 2013.

Contractors Involved

Voith Hydro Holding was selected as the turbine supplier for the hydro power project. The company provided 2 units of kaplan turbines, each with 62.5MW nameplate capacity.

Voith Hydro Holding supplied electric generator(s) for the project.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.