Huainan Tianji Power Plant is a 2,580MW coal fired power project. It is located in Anhui, China. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in July 2007.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 2,580 | 2,580 | – | Active | Anhui, China |
---|
Description
The project is co-owned by Huainan Mining Group and Shanghai Electric Power, with their respective ownership stake of 50% each.
It is a steam turbine power plant.
Development Status
The project got commissioned in July 2007.
Contractors Involved
Anhui No.1 Electric Power Construction was selected to render EPC services for the Huainan Tianji Power Plant (Huainan Tianji Power Plant Phase II Unit I) project. Anhui No.1 Electric Power Construction was selected to render EPC services for the Huainan Tianji Power Plant (Huainan Tianji Power Plant Phase II Unit II) project.
Huainan Tianji Power Plant (Huainan Tianji Power Plant Phase I Unit I) is equipped with Shanghai Turbine steam turbine. The phase consists of 1 steam turbine with 630MW nameplate capacity.
Huainan Tianji Power Plant (Huainan Tianji Power Plant Phase I Unit II) is equipped with Shanghai Turbine steam turbine. The phase consists of 1 steam turbine with 630MW nameplate capacity.
Shanghai Electrical Machinery Group supplied TDF-118/56 electric generator for the Huainan Tianji Power Plant (Huainan Tianji Power Plant Phase I Unit I).
Shanghai Electrical Machinery Group supplied TDF-118/56 electric generator for the Huainan Tianji Power Plant (Huainan Tianji Power Plant Phase I Unit II).
Shanghai Boiler Works supplied steam boiler for the Huainan Tianji Power Plant (Huainan Tianji Power Plant Phase I Unit I).
Shanghai Boiler Works supplied steam boiler for the Huainan Tianji Power Plant (Huainan Tianji Power Plant Phase I Unit II).
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.