Huaneng Yuhuan Power Plant is a 4,000MW coal fired power project. It is located in Zhejiang, China. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in November 2006.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 4,000 | 4,000 | – | Active | Zhejiang, China |
---|
Description
The project is currently owned by Huaneng Power International with a stake of 100%.
It is a steam turbine power plant.
The project generated 21,771,000MWh of electricity.
Development Status
The project got commissioned in November 2006.
Power Purchase Agreement
The power generated from the project is sold to Zhejiang Provincial Electric Power under a power purchase agreement.
Contractors Involved
East China Electric Power Design Institute, Tianjin Electric Power Construction and Zhejiang Thermal Power Construction were selected to render EPC services for the coal fired power project.
Siemens was selected as the turbine supplier for the Coal fired project. The company provided 4 units of SST5-6000 steam turbines, each with 1,000MW nameplate capacity.
Shanghai Electrical Machinery Group supplied THDF125 / 67 electric generator for the project.
Harbin Boiler supplied steam boiler for the project.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.