Igelsta CHP Plant is an 85MW biopower project. It is located in Sodermanland, Sweden. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in December 2009.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Biopower | 85 | 85 | – | Active | Sodermanland, Sweden |
---|
Description
The project is currently owned by Soderenergi.
The project supplies enough clean energy to power 100,000 households, offsetting 75,000t of carbon dioxide emissions (CO2) a year. The project cost is $347.195m.
The process of combustion has been adopted in this combined heat and power (CHP) project to release the stored energy from the feed. Municipal solid waste and wood by-product are used as a feedstock to power the project.
Development Status
The project got commissioned in December 2009.
Contractors Involved
Siemens was selected as the steam turbine supplier for the project.
Sumitomo SHI FW Energia supplied steam boiler for the project. The temperature witnessed inside the boiler is around 540°C. The steam is pressurized inside the boiler at 90bar.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.