Jebel Ali M Power Station is a 2,184MW gas fired power project. It is located in Dubai, United Arab Emirates. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in 2012.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 2,184 | 2,184 | – | Active | Dubai, United Arab Emirates |
---|
Description
The project is currently owned by Dubai Electricity and Water Authority with a stake of 100%.
It is a ccgt with cogen power plant. The power plant run on dual-fuel. The primary fuel being used to power the plant is natural gas. In case of shortage of natural gas the plant can also run on Diesel.
The project cost is $2,722m.
Development Status
The project got commissioned in 2012.
Contractors Involved
Doosan Heavy Industries & Construction was selected to render EPC services for the gas fired power project.
The Gas fired project have been supplied by GE Power and Siemens.
The electric generators for the project were procured from GE Power and Siemens.
Doosan Heavy Industries & Construction supplied steam boiler for the project.
Siemens is the O&M contractor for thermal power project. The operation and maintenance contract commenced from 2012, for a period of 12 years.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.