Jiangsu Datang Lvsi Port Power Plant, China

By Carmen

Jiangsu Datang Lvsi Port Power Plant is a 2,640MW coal fired power project. It is located in Jiangsu, China. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in 2010.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Thermal 2,640 2,640 Active Jiangsu, China

Description

Datang International Power Generation and China Datang are currently owning the project having ownership stake of 55% and 35% respectively.

It is a steam turbine power plant.

The project cost is $1,713.29m.

Development Status

Content from our partners
Green investment: What gives Scotland multiple advantages
How Hengst helped to keep Germany’s charity “star singers” shining
How one power station prevented frequent shutdowns with three-stage air filtration

The project got commissioned in 2010.

Contractors Involved

Jiangsu Datang Lvsi Port Power Plant (Jiangsu Datang Lvsi Port Power Plant Unit I) is equipped with Harbin Turbine steam turbine. The phase consists of 1 steam turbine with 660MW nameplate capacity.

Jiangsu Datang Lvsi Port Power Plant (Jiangsu Datang Lvsi Port Power Plant Unit II) is equipped with Harbin Turbine steam turbine. The phase consists of 1 steam turbine with 660MW nameplate capacity.

Jiangsu Datang Lvsi Port Power Plant (Jiangsu Datang Lvsi Port Power Plant Unit III) is equipped with Harbin Turbine steam turbine. The phase consists of 1 steam turbine with 660MW nameplate capacity.

Jiangsu Datang Lvsi Port Power Plant (Jiangsu Datang Lvsi Port Power Plant Unit IV) is equipped with Harbin Turbine steam turbine. The phase consists of 1 steam turbine with 660MW nameplate capacity.

Harbin Electric Machinery supplied electric generator for the Jiangsu Datang Lvsi Port Power Plant (Jiangsu Datang Lvsi Port Power Plant Unit I).

Harbin Electric Machinery supplied electric generator for the Jiangsu Datang Lvsi Port Power Plant (Jiangsu Datang Lvsi Port Power Plant Unit II).

Harbin Electric Machinery supplied electric generator for the Jiangsu Datang Lvsi Port Power Plant (Jiangsu Datang Lvsi Port Power Plant Unit III).

Harbin Electric Machinery supplied electric generator for the Jiangsu Datang Lvsi Port Power Plant (Jiangsu Datang Lvsi Port Power Plant Unit IV).

Harbin Boiler supplied steam boiler for the Jiangsu Datang Lvsi Port Power Plant (Jiangsu Datang Lvsi Port Power Plant Unit I).

Harbin Boiler supplied steam boiler for the Jiangsu Datang Lvsi Port Power Plant (Jiangsu Datang Lvsi Port Power Plant Unit II).

Harbin Boiler supplied steam boiler for the Jiangsu Datang Lvsi Port Power Plant (Jiangsu Datang Lvsi Port Power Plant Unit III).

Harbin Boiler supplied steam boiler for the Jiangsu Datang Lvsi Port Power Plant (Jiangsu Datang Lvsi Port Power Plant Unit IV).

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.

Related Companies

NEWSLETTER Sign up Tick the boxes of the newsletters you would like to receive. The top stories of the day delivered to you every weekday. A weekly roundup of the latest news and analysis, sent every Wednesday. The power industry's most comprehensive news and information delivered every month.
I consent to GlobalData UK Limited collecting my details provided via this form in accordance with the Privacy Policy
SUBSCRIBED

THANK YOU