Jiangyin Sulong Power Plant is a 1,215MW coal fired power project. It is located in Jiangsu, China. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in 1995.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 1,215 | 1,215 | – | Active | Jiangsu, China |
---|
Description
The project is currently owned by Jiangyin Sulong Power Generation.
It is a steam turbine power plant.
Jiangyin Sulong Power Plant (Jiangyin Sulong Power Plant Phase I) consists of 2 steam turbines with 137.5MW nameplate capacity.
Development Status

US Tariffs are shifting - will you react or anticipate?
Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.
By GlobalDataThe project got commissioned in 1995.
Contractors Involved
Jiangyin Sulong Power Plant (Jiangyin Sulong Power Plant Phase II) is equipped with Shanghai Turbine steam turbines. The phase consists of 2 steam turbines, each with 140MW nameplate capacity.
Jiangyin Sulong Power Plant (Jiangyin Sulong Power Plant Phase III) is equipped with Shanghai Turbine N330-16.7/538/538 steam turbines. The phase consists of 2 steam turbines with 330MW nameplate capacity.
Shanghai Electric Group supplied QFS2-330-2 electric generator for the Jiangyin Sulong Power Plant (Jiangyin Sulong Power Plant Phase III).
Shanghai Boiler Works supplied steam boiler for the Jiangyin Sulong Power Plant (Jiangyin Sulong Power Plant Phase II).
Shanghai Boiler Works supplied steam boiler for the Jiangyin Sulong Power Plant (Jiangyin Sulong Power Plant Phase III).
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.