Jilin Jiutai Biomass Power Plant is a 25MW biopower project. It is located in Jilin, China. The project is currently active. It has been developed in single phase.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Biopower | 25 | 25 | – | Active | Jilin, China |
---|
Description
The project generates 140GWh electricity thereby offsetting 137,634t of carbon dioxide emissions (CO2) a year.
Maize straw which is a kind of agricultural by-product is used as a feedstock to power the project.
Power Purchase Agreement
The power generated from the project is sold to Northeast China Power Grid under a power purchase agreement.
Contractors Involved
Burmeister & Wain Energy supplied steam boiler for the project. The temperature witnessed inside the boiler is around 540Degree Celsius. The steam is pressurized inside the boiler at 9MPa.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.