Jirau is a 3,750MW hydro power project. It is located on Madeira river/basin in Rondonia, Brazil. The project is currently active. It has been developed in multiple phases. The project construction commenced in 2009 and subsequently entered into commercial operation in 2013.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Hydropower 3,750 3,750 Active Rondonia, Brazil Energia Sustentavel do Brasil

Description

The project was developed by Energia Sustentavel do Brasil. Engie, Companhia Hidro Eletrica do Sao Francisco, Eletrosul Centrais Eletricas and Mitsui are currently owning the project having ownership stake of 40%, 20%, 20% and 20% respectively.

Jirau is a run-of-river project. The gross head of the project is 30m. The project cost is $7,938.48m.

The Jirau (Jirau Active Units) has 18 electric generators installed at the site. The generator capacity is 83.33 MVA.

Development Status

The project construction commenced in 2009 and subsequently entered into commercial operation in 2013.

Contractors Involved

Jirau (Jirau Active Units) is equipped with Andritz Hydro bulb turbines. The phase consists of 8 turbines with 76.55MW nameplate capacity.

Jirau (Jirau Active Units) is equipped with Dongfang Electric bulb turbines. The phase consists of 14 turbines with 76.5MW nameplate capacity.

Jirau (Jirau Active Units) is equipped with GE Renewable Energy bulb turbines. The phase consists of 10 turbines with 76.55MW nameplate capacity.

Jirau (Jirau Active Units) is equipped with Voith Hydro Holding bulb turbines. The phase consists of 10 turbines with 76.55MW nameplate capacity.

Jirau (Jirau Main Units) is equipped with Dongfang Electric bulb turbines. The phase consists of 8 turbines with 76.5MW nameplate capacity.

Dongfang Electric supplied 12 electric generators for the Jirau (Jirau Active Units). The generator capacity is 83.33 MVA.

GE Renewable Energy supplied 10 electric generators for the Jirau (Jirau Active Units). The generator capacity is 83.33 MVA.

Dongfang Electric supplied 8 electric generators for the Jirau (Jirau Main Units). The generator capacity is 83.33 MVA.

About Energia Sustentavel do Brasil

Energia Sustentavel do Brasil is a renewable energy company. It is engaged in the development of the hydro power project located in Brazil. The total installed capacity of the project is 800 MW.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.

Related Companies

NEWSLETTER Sign up Tick the boxes of the newsletters you would like to receive. The top stories of the day delivered to you every weekday. A weekly roundup of the latest news and analysis, sent every Wednesday. The power industry's most comprehensive news and information delivered every month.
I consent to GlobalData UK Limited collecting my details provided via this form in accordance with the Privacy Policy
SUBSCRIBED

THANK YOU

Thank you for subscribing to Power Technology