Joetsu Thermal Power Station is a 2,380MW gas fired power project. It is located in Niigata, Japan. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in July 2012.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 2,380 | 2,380 | – | Active | Niigata, Japan |
---|
Description
The project is currently owned by JERA.
It is a combined cycle gas turbine (ccgt) power plant.
Joetsu Thermal Power Station (Joetsu Thermal Power Station Unit I) consists of 1 steam turbine.
Joetsu Thermal Power Station (Joetsu Thermal Power Station Unit II) consists of 1 steam turbine.
Joetsu Thermal Power Station (Joetsu Thermal Power Station Unit III) consists of 1 steam turbine.
Joetsu Thermal Power Station (Joetsu Thermal Power Station Unit IV) consists of 1 steam turbine.
Development Status
The project got commissioned in July 2012.
Contractors Involved
Joetsu Thermal Power Station (Joetsu Thermal Power Station Unit I) is equipped with GE Power 7F.04 gas turbines. The phase consists of 2 gas turbines.
Joetsu Thermal Power Station (Joetsu Thermal Power Station Unit II) is equipped with GE Power 7F.04 gas turbines. The phase consists of 2 gas turbines.
Joetsu Thermal Power Station (Joetsu Thermal Power Station Unit III) is equipped with GE Power 7F.04 gas turbines. The phase consists of 2 gas turbines.
Joetsu Thermal Power Station (Joetsu Thermal Power Station Unit IV) is equipped with GE Power 7F.04 gas turbines. The phase consists of 2 gas turbines.
MHPS (Philippines) supplied steam boiler for the Joetsu Thermal Power Station (Joetsu Thermal Power Station Unit I).
MHPS (Philippines) supplied steam boiler for the Joetsu Thermal Power Station (Joetsu Thermal Power Station Unit II).
MHPS (Philippines) supplied steam boiler for the Joetsu Thermal Power Station (Joetsu Thermal Power Station Unit III).
MHPS (Philippines) supplied steam boiler for the Joetsu Thermal Power Station (Joetsu Thermal Power Station Unit IV).
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.