Jorge Lacerda Power Plant is an 857MW coal fired power project. It is located in Santa Catarina, Brazil. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in March 1965.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Thermal 857 857 Active Santa Catarina, Brazil

Description

Discover B2B Marketing That Performs

Combine business intelligence and editorial excellence to reach engaged professionals across 36 leading media platforms.

Find out more

It is a Steam Turbine power plant.

Development Status

The project got commissioned in March 1965.

Contractors Involved

GlobalData Strategic Intelligence

US Tariffs are shifting - will you react or anticipate?

Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.

By GlobalData

Jorge Lacerda Power Plant (Jorge Lacerda Power Plant A Unit I) is equipped with MAN Energy Solutions steam turbine. The phase consists of 1 steam turbine with 50MW nameplate capacity.

Jorge Lacerda Power Plant (Jorge Lacerda Power Plant A Unit II) is equipped with MAN Energy Solutions steam turbine. The phase consists of 1 steam turbine with 50MW nameplate capacity.

Jorge Lacerda Power Plant (Jorge Lacerda Power Plant A Unit III) is equipped with GE Power steam turbine. The phase consists of 1 steam turbine with 66MW nameplate capacity.

Jorge Lacerda Power Plant (Jorge Lacerda Power Plant A Unit IV) is equipped with GE Power steam turbine. The phase consists of 1 steam turbine with 66MW nameplate capacity.

Jorge Lacerda Power Plant (Jorge Lacerda Power Plant B Unit I) is equipped with Doosan Skoda Power steam turbine. The phase consists of 1 steam turbine with 131MW nameplate capacity.

Jorge Lacerda Power Plant (Jorge Lacerda Power Plant B Unit II) is equipped with Doosan Skoda Power steam turbine. The phase consists of 1 steam turbine with 131MW nameplate capacity.

Jorge Lacerda Power Plant (Jorge Lacerda Power Plant C) is equipped with Ansaldo Energia steam turbine. The phase consists of 1 steam turbine with 363MW nameplate capacity.

GE Power supplied electric generator for the Jorge Lacerda Power Plant (Jorge Lacerda Power Plant A Unit I).

GE Power supplied electric generator for the Jorge Lacerda Power Plant (Jorge Lacerda Power Plant A Unit II).

ASGEN supplied electric generator for the Jorge Lacerda Power Plant (Jorge Lacerda Power Plant A Unit III).

ASGEN supplied electric generator for the Jorge Lacerda Power Plant (Jorge Lacerda Power Plant A Unit IV).

Doosan Skoda Power supplied electric generator for the Jorge Lacerda Power Plant (Jorge Lacerda Power Plant B Unit I).

Doosan Skoda Power supplied electric generator for the Jorge Lacerda Power Plant (Jorge Lacerda Power Plant B Unit II).

Doosan Skoda Power supplied electric generator for the Jorge Lacerda Power Plant (Jorge Lacerda Power Plant C).

MAN Energy Solutions supplied steam boiler for the Jorge Lacerda Power Plant (Jorge Lacerda Power Plant A Unit I).

MAN Energy Solutions supplied steam boiler for the Jorge Lacerda Power Plant (Jorge Lacerda Power Plant A Unit II).

Ansaldo Energia supplied steam boiler for the Jorge Lacerda Power Plant (Jorge Lacerda Power Plant A Unit III).

Ansaldo Energia supplied steam boiler for the Jorge Lacerda Power Plant (Jorge Lacerda Power Plant A Unit IV).

SES Tlmace supplied steam boiler for the Jorge Lacerda Power Plant (Jorge Lacerda Power Plant B Unit I).

SES Tlmace supplied steam boiler for the Jorge Lacerda Power Plant (Jorge Lacerda Power Plant B Unit II).

SES Tlmace supplied steam boiler for the Jorge Lacerda Power Plant (Jorge Lacerda Power Plant C).

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.