Juba is an 84MW hydro power project. It is located on Juba river/basin in Mato Grosso, Brazil. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in 1995.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 84 | 84 | – | Active | Mato Grosso, Brazil |
---|
Description
The project is currently owned by Itamarati Norte with a stake of 100%.
The project generated 500 GWh of electricity.
Juba (Juba II) consists of 4 turbines with 10.5MW nameplate capacity.
The Juba (Juba II) has 4 electric generators installed at the site. The generator capacity is 12 MVA.
Development Status
The project got commissioned in 1995.
Contractors Involved
Juba (Juba I) is equipped with ALSTOM Hydro Energia Brasil francis turbines. The phase consists of 4 turbines with 10.5MW nameplate capacity.
ALSTOM Hydro Energia Brasil supplied 4 electric generators for the Juba (Juba I). The generator capacity is 12 MVA.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.