Julongtan is a 60MW hydro power project. It is located on Gong river/basin in Jiangxi, China. The project is currently active. It has been developed in single phase. The project construction commenced in 2004 and subsequently entered into commercial operation in 2007.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Hydropower 60 60 Active Jiangxi, China Jiangxi Ganneng

Description

The project is developed and owned by Jiangxi Ganneng. The company has a stake of 100%.

Julongtan is a reservoir based project. The hydro reservoir capacity is 73.6 million cubic meter. The project generated 197 GWh of electricity. The project cost is $45.9m.

The hydro power project consists of 2 turbines, each with 30MW nameplate capacity.

Development Status

The project construction commenced in 2004 and subsequently entered into commercial operation in 2007.

Power Purchase Agreement

The power generated from the project is sold to State Grid Corporation of China under a power purchase agreement.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.