Kangding Huashangou is a 72MW hydro power project. It is located in Sichuan, China. The project is currently active. It has been developed in single phase. The project construction commenced in 2006 and subsequently entered into commercial operation in 2009.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Hydropower 72 72 Active Sichuan, China Sichuan Balanghe Hydro Power Development

Description

The project was developed by Sichuan Balanghe Hydro Power Development.

The project generated 255.7 GWh of electricity. The project cost is $118.32m.

The hydro power project consists of 2 turbines, each with 36MW nameplate capacity.

The project has 3 electric generators installed at the site.

Development Status

The project construction commenced in 2006 and subsequently entered into commercial operation in 2009.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.