Kawas Combined Cycle Power Plant is a 1,945MW gas fired power project. It is located in Gujarat, India. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in June 1992.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 1,945 | 1,945 | – | Active | Gujarat, India | NTPC |
---|
Description
The project is developed and owned by NTPC.
It is a combined cycle gas turbine (ccgt) power plant that is used for Baseload.
Development Status
The project got commissioned in June 1992.
Contractors Involved
Kawas Combined Cycle Power Plant (Kawas Combined Cycle Power Plant Stage I Unit I) is equipped with GE Power MS9001E gas turbine. The phase consists of 1 gas turbine with 106MW nameplate capacity.
Kawas Combined Cycle Power Plant (Kawas Combined Cycle Power Plant Stage I Unit II) is equipped with GE Power MS9001E gas turbine. The phase consists of 1 gas turbine with 106MW nameplate capacity.
Kawas Combined Cycle Power Plant (Kawas Combined Cycle Power Plant Stage I Unit III) is equipped with GE Power MS9001E gas turbine. The phase consists of 1 gas turbine with 106MW nameplate capacity.
Kawas Combined Cycle Power Plant (Kawas Combined Cycle Power Plant Stage I Unit IV) is equipped with GE Power MS9001E gas turbine. The phase consists of 1 gas turbine with 106MW nameplate capacity.
Kawas Combined Cycle Power Plant (Kawas Combined Cycle Power Plant Stage I Unit V) is equipped with GE Power steam turbine. The phase consists of 1 steam turbine with 110.5MW nameplate capacity.
Kawas Combined Cycle Power Plant (Kawas Combined Cycle Power Plant Stage I Unit VI) is equipped with GE Power steam turbine. The phase consists of 1 steam turbine with 110.5MW nameplate capacity.
GE Power supplied electric generator for the Kawas Combined Cycle Power Plant (Kawas Combined Cycle Power Plant Stage I Unit I).
GE Power supplied electric generator for the Kawas Combined Cycle Power Plant (Kawas Combined Cycle Power Plant Stage I Unit II).
GE Power supplied electric generator for the Kawas Combined Cycle Power Plant (Kawas Combined Cycle Power Plant Stage I Unit III).
GE Power supplied electric generator for the Kawas Combined Cycle Power Plant (Kawas Combined Cycle Power Plant Stage I Unit IV).
GE Power supplied electric generator for the Kawas Combined Cycle Power Plant (Kawas Combined Cycle Power Plant Stage I Unit V).
GE Power supplied electric generator for the Kawas Combined Cycle Power Plant (Kawas Combined Cycle Power Plant Stage I Unit VI).
John Cockerill Group supplied steam boiler for the project.
NTPC is the O&M contractor for thermal power project.
About NTPC
NTPC Ltd (NTPC) is an energy conglomerate. It has presence in the entire value chain of the power generation business. The company produces electricity and sells that to state power utilities on wholesale basis. NTPC generates electric power using the coal, gas, liquid fuel, hydro and renewable sources. It has interests in various power plants under development and implementation stages. The company also provides consultancy, project management and supervision; holds interests in coal mining blocks; and carries out energy trading, oil and gas exploration, training of power professionals, rural electrification, ash utilisation and coal mining. NTPC is headquartered in New Delhi, India.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.