Kelsey is a 286MW hydro power project. It is located on Nelson river/basin in Manitoba, Canada. The project is currently active. It has been developed in single phase. The project construction commenced in 1957 and subsequently entered into commercial operation in 1961.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 286 | 286 | – | Active | Manitoba, Canada |
---|
Description
The project is currently owned by Manitoba Hydro-Electric Board.
The hydro reservoir capacity is 1,850.25 million cubic meter. The net head of the project is 17.1m. The project cost is $50m.
Development Status
The project construction commenced in 1957 and subsequently entered into commercial operation in 1961.

US Tariffs are shifting - will you react or anticipate?
Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.
By GlobalDataContractors Involved
Dominion Engineering was selected as the turbine supplier for the hydro power project. The hydro power project consists of 7 turbines.
Canadian General Electric supplied electric generator(s) for the project.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.